Sabtu, 30 April 2011

The PT-30 power restoration unit is designed to temporarily restore underground secondary service when one phase has failed and one phase remains, or if the neutral has been lost. By connecting the PT-30 between the customer’s meter socket and the meter, power can be immediately restored without having to locate and repair the cable fault. This allows for repair of the cable to be completed when schedule permits.

1 komentar: